Friday 8 June 2012

Fitout Continues and Waste Plant Installed

The portico and outdoor room cedar ceilings were completed and look great.
The cleaner came in and swept out the house, moving dust from one location to another. (Don't know why they do not use a vacuum).

Portico Ceder Lining

Front Entrance (Double doors. which were
incorrect are yet to be installed)

Outdoor Room Cedar Lining
The waste treatment plant (worm farm) was installed leaving behind a trail of mud.


The driveway is now just lined with mud.

Dispersion Trenches for the Treatment Plant turned the front
of the block to mud.