Thursday, 7 June 2012

Fitout Begins

The past few days the carpenters have started the fit out. Doors and cedar lined ceilings have been installed.
All the doors are now installed, with the exception of the front door (wrong doors delivered). The pantry door which was installed as a clear door is yet to be replaced by a translucent door (which has been delivered on site)

Sitting Room Sliding Doors

Master Bedroom Entracnce

Outdoor Room and Dining Room

The cedar lined entrance is complete and the lining in the outdoor room and portico should be completed today.


The Hebal is still not complete, although the installers left saying they were finished?
The quality of the Hebal installation is very average and they are reliant on the render applicators to ensure a smooth and seamless finish.




1 comment:

  1. Hi guys,

    what a sensational part of the world you live in. We love the peninsula, my Mum lives in Dromana.

    The Seductive Limba is really great! Seduced me :) lol.

    Good luck on more progress.

    ReplyDelete