The gutters and fascia went on today.
The Group 4 building inspector came and advised a few issues need fixing before the roof can proceed. I'm sure his list got bigger when I advised we had an Independent Inspector coming in the morning!! Wasn't the same inspector was a contracted inspector from Bayside Inspections on behalf of Group 4.
The front door and bi-fold frames were also completed late yesterday.
|
Looking in the wide
front entrance. |
|
The Outdoor Room Bi fold frames installed.
NB The posts are temporary!! |
Meanwhile work continues around the block.
The front fence has gone and marked for post holes to be drilled on the weekend.
The new fence will be post and rail with wire mesh.
|
Getting a clear run for the new fence was a challenge.
Not to mention removing rusted barb wire. |
And the timber for the raised vegetable garden have arrived.
|
Red gum Chosen In Preference to Treated Pine. |
Packing sand for the water tank will arrive on Friday and on Sunday the excavator will dig out the pad and move the sand top the site. (Unfortunately we cannot get the delivery truck to the pad site!).
Also to be completed on the weekend:
- Agi drains for water from neighbours dam.
- Post holes for front fence
- Compost Bins Site leveled and post holes dug.
- Excess soil levelled.
No comments:
Post a Comment