Clyde and Karens Metricon Chelsea 37
Friday, 16 March 2012
Power was connected (almost!!)
Meter Box Is Installed
Today the power cabling and meter box were installed. Still needs to go live.
We laid the telstra conduit to avoid digging up the driveway again.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment